To put it simply, following are the key checkpoints -
1) Adequate finance for the project preferably along with a tentative project report though the report is not a necessity if finance fully arranged.
2) Plot and building of a size based on desired battery manufacturing capacity.
3) All permissions and approvals from various government authorities including from pollution control board.
4) Technical knowledge and process knowhow of battery manufacture.
5) Machines of good quality with proven product output giving a consistent quality saleable battery.
6) A consultant with sufficient knowledge of batteries to liase between you & the machinery vendor.
7) Machine vendor who can preferably guide you as regards materials sourcing, materials specifications and the material test procedures in addition to guidance on process - sufficient to produce a battery.
In case you are in a position to cater to Sr. No. 1 to 3 stated above on your own you may contact the undersigned who can satisfy your requirements as regards Sr. No. 4 to 7 in a comprehensive manner.